Stop four · The end of loading bay 2

The Quarry

At the far end of loading bay 2 the sidings stop at a row of buffer stops beneath a pylon, and beyond them a quarry is cut into the rock.

A Russell lorry waits by the tunnel mouth while an excavator loads a dumper with stone.

Gold markers point out small details. Select one to read about it.

A closer look at the quarry face: quarrymen in hard hats stand by the RUSSELL lorry and a bulldozer, while a Volvo excavator and a laden dumper stand among the stone heaps.19:52
Across the empty yard sidings lies the quarry: a RUSSELL lorry loaded with stone waits by a tunnel mouth, and a Volvo excavator stands over a loaded yellow dumper.19:52
Three diesels rest at the end of the yard sidings below the rock face, beside a row of buffer stops, a lattice pylon and a hoarding for Heinz cooked spaghetti.19:50

At the buffer stops

Beneath the rock face, the Class 59s “Pride of Ferrybridge” and “Kenneth J Painter” stand with a Class 50 by the buffer stops, watched over by a pylon and a hoarding for Heinz Spaghetti.

Look closer

Nearest in the line-up, Class 59 ‘Pride of Ferrybridge’ wears her name on a small red plate, with ‘Kenneth J Painter’ resting beside her.

Beneath the pylon, a row of buffer stops ends the sidings beside a small timber cabin, while two BR blue diesels wait behind a tall conifer.17:12
A hoarding for “HEINZ COOKED SPAGHETTI”, showing the tin and a dish with a fork in it, stands on the bank behind the row of buffer stops.19:45
Two diesels stand on the sidings beside a row of buffer stops and the Heinz Spaghetti hoarding, as men in red hard hats work in the cutting below the pylon.19:45